긴급선행기간을 이용한 MRP 시스템

MRP System with Emergent Lead Time

  • 발행 : 1991.04.30

초록

This paper develops MRP system with two-types of lead time(average lead time and emergent lead time). In this proposed MRP system, Material Requirement Planning is scheduled by using average lead time, but the emergent lead time is used only when start date of planned order is past. Btrieve data management technique and Stack structure are used for recalculating procedure of planned order with the TURBO PASCAL Version 5.5. An example is also considered.