The Critical Success Factors of Six Sigma in China Manufacturing Industry

  • Yi-Zhong, Ma (Department of Management Engineering, Nanjing University of Science and Technology) ;
  • Gang, Yue (Department of Development and Strategy, China Association for Quality) ;
  • Li-Lin, Wang (Department of Development and Strategy, China Association for Quality) ;
  • Ree, Sang-Bok (Department of Industrial Engineering, Seokyeong University)
  • 발행 : 2008.08.31

초록

Six Sigma has been one of main quality improvement approaches since Motorola first invented Six Sigma in 1987. Many scholars and consult experts have discussed the critical success factors of implementing Six Sigma management, but most of them are based on related theories or qualitative analyses. In the paper, we first review critical success factor of Six Sigma status quo based on literature. Then we design the questionnaire and survey China manufacturing enterprises that have introduced Six Sigma management. And finally, we analyze the critical success factors of China manufacturing industry implementing Six Sigma management by using structural equation model and find that leadership and Six Sigma strategy, focus on market and customer, evaluation and motivation, selecting, managing and implementing Six Sigma projects are four critical success factors of China manufacturing enterprises implementing Six Sigma management. At the same time, the paper also presents the relationships between the critical success factors. The results are of important role in China manufacturing industry locating resources, eliminating waste and improving Six Sigma performance.

키워드

참고문헌

  1. Haln, G. J. Doganaksoy, N., and Hoerl, R.(2000), "The Evolution of Six Sigma," Quality Engineering, Vol. 12, pp. 317-326 https://doi.org/10.1080/08982110008962595
  2. Watson, G. H.(2003), "Six Sigma: An Evolving Stage in the Maturing of Quality," (T. Conti, Y. Kando, G. H. Watson, Editors), Quality into 21th Century, ASQ Quality Press, Milwankee Wisconsin
  3. Goh, T. G.(2002), "A Strategic Assessment of Six Sigma," Quality and Reliability Engineering International, Vol. 18, No. 4, pp. 403-410 https://doi.org/10.1002/qre.491
  4. Harris, B. and Harris, E.(2002), "Transactional Six Sigma and Lean Servicing," New York, SLP
  5. Revere, L., Black, K., and Hug, A.(2004), "Intergrating Six Sigma and CQI for Improving Patient Care," The TQM Magazine, Vol. 16, No. 2, pp. 105-113 https://doi.org/10.1108/09544780410522991
  6. Hong, G. Y. and Goh, T. G.(2003), "Six Sigma in Software Quality," The TQM Magazine, Vol. 15, No. 6, pp. 364-371 https://doi.org/10.1108/09544780310502697
  7. Yue, G. and Ma, Y. Z.(2006), "Some issues on Six Sigma management," Statistics and Management, (In Chinese) Vol. 25, No. 3, pp. 351-357
  8. The Six Sigma Promotion Committee of China(2007), "Criteria for Six Sigma Management," Standards Press of China, (In China) Beijing
  9. Yusof, S. M. and Aspinwall, E.(1999), "Critical Success Factors for Total Quality Management Implementation in Small and medium Enterprises," Total Quality Management, Vol. 10, pp. 803-809 https://doi.org/10.1080/0954412997839
  10. Snee, R.-D.(1990), "Why Should Statisticians Pay Attention to Six Sigma?," Quality Progress, No. 9, pp. 100-104
  11. Blakeslee, Jr. J.-A.(1999), "Implementing the Six Sigma Solution," Quality Progress, No. 8, pp. 70-85
  12. Goldstein, M.(2001), "Six Sigma Program Success Factors," Six Sigma Forum Magazine, No. 9, pp. 36-45
  13. Banuelas, C. R. and Antony, J.(2002), "Critical Success Factors for the Successful Implementation of Six Sigma Projects in Organizations," The TQM Magazine, Vol. 14, No. 2, pp. 92-99 https://doi.org/10.1108/09544780210416702
  14. Starbird, D.(2002), "Business Excellence: Six Sigma as a Management System," ASQ's 56th Annual Quality Congress Proceedings, pp. 45-47
  15. Chen, J.(2006), "DMAIC Integration Necessary for Success," Six Sigma Forum Magazine, No. 8, pp. 22-28
  16. Lee, K.(2002), "Critical Success Factors of Six Sigma Implementation and the Impact on Operations Performance," Ph.D Dissertation, Cleveland State University
  17. Byrne, G. and Norris, B.(2003), "Drive Baldrige Level Performance," Six Sigma Forum Magazine, No. 5, pp. 13-21
  18. Kwak, Y. H. and Anbari, F. T.(2006), "Benefits, Obstacles, and Future of Six Sigma Approach," Technovation, Vol. 26, pp. 708-715 https://doi.org/10.1016/j.technovation.2004.10.003
  19. Gupta, P.(2005), "Innovation: the Key to a Successful Project," Six Sigma Forum Magazine, No. 8, pp. 13-17
  20. Hariharan, A.(2006), "CEO's Guide to Six Sigma Success," Six Sigma Forum Magazine, No. 5, pp. 16-25
  21. Brady, J. E. and Allen, T. T.(2006), "Six Sigma Literature: A Review and Agenda for Future Research," Quality and Reliability Engineering International, Vol. 22, pp. 335-367 https://doi.org/10.1002/qre.769
  22. Hou, J. T., Wen, Z. L. and Cheng, Z. J.(2004), "Structural Equation Model and Its Applications," Education Publisher of China, Beijing