참고문헌
- Flapper, S. D. P. & Teunter, R. H., "Logistic planning of rework with deteriorating work in process," International Journal of Production Economics, Vol. 88, pp. 51-59, 2004. https://doi.org/10.1016/S0925-5273(03)00130-0
- Kang Y.H., & Shin H.J, "An adaptive scheduling algorithm for a parallel machine problem with rework processes," International Journal of Production Research, Vol. 48, pp. 95-115, 2010. https://doi.org/10.1080/00207540802484903
- Demirkov, E., & Uzsoy, R., "Decomposition methods for reentrant flow shops with sequence-dependent setup times," Journal of Scheduling, Vol. 3, pp. 155-177, 2000. https://doi.org/10.1002/(SICI)1099-1425(200005/06)3:3<155::AID-JOS39>3.0.CO;2-E
- Liu, J.J., & Ping, Y., ìOptimal lot-sizing in an imperfect production system with homogeneous reworkable jobs,i European Journal of Operational Research, Vol. 91, pp.517-527, 1996. https://doi.org/10.1016/0377-2217(94)00339-4
- So, K.C., & Tang, C.S., "Optimal operating policy for a bottleneck with random rework," Management Science," Vol. 41, pp. 620-636, 1995. https://doi.org/10.1287/mnsc.41.4.620
- Lee, D.H., Ko, H.H., & Kim, S.S., "A study of strategy for planning of rework in semiconductor monitoring burn in test process," IE interfaces, Vol. 18, pp. 350-360, 2005.
- Zargar, A.M., "Effect Of Rework Strategies On Cycle Time," Computers & Industrial Engineering, Vol. 29, pp. 239-243, 1995. https://doi.org/10.1016/0360-8352(95)00078-F
- Sha, D. Y., Hsu, S. Y., Che, Z. H., & Chen, C. H., "A dispatching rule for photolithography scheduling with an online rework strategy," Computers & Industrial Engineering, Vol. 50, pp. 233-247, 2006. https://doi.org/10.1016/j.cie.2006.04.002