시멘틱 웹을 활용한 BIM기반 유지보수 업무 우선순위 관리 자동화 방안

Automated Priority Management for BIM-based Maintenance Work using Semantic Web

  • 투고 : 2016.10.05
  • 심사 : 2017.01.05
  • 발행 : 2017.01.30

초록

To efficiently operate and maintain a facility, an information management system has to consider the limitations of resources and labors for the facility management (FM) and characteristics of a facility to support various practical maintenance works. However, there are some potential problems to access the required data on the system as following: 1) lacks of usability and accessibility of building information modeling (BIM)-based FM information, 2) decision making process of the maintenance work priority performed by a facility manager with subjective perspective, and 3) the constraint conditions of maintenance works are frequently changed. Therefore, this study proposed an approach of BIM-based priority management for maintenance works using semantic web. To that end, an ontology has developed to link the BIM objects and maintenance work information with facility condition index, and the ontology-based priority management process is suggested. Using the proposed approach, facility managers will be able to increase their efficiency in managing the work priorities considering the BIM objects. This study will contribute to increasing the usability and accessibility of BIM in the FM area, in providing integrated FM information using a semantic web.

키워드

과제정보

연구 과제 주관 기관 : 한국연구재단

참고문헌

  1. Alex, T. (2011). The SALVO project: innovative approaches to decision-making for the management of aging physical assets, Infra assets, Kuala Lumpur, 1-11.
  2. Delphi Group, (2002). Perspectives on Information Retrieval, Delphi Group, Boston, MA,
  3. East, W. E. Nisbet, N. & Liebich, T. (2013). Facility Management Handover Model View, Journal of Computing in Civil Engineering, 27(1), 61-67. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000196
  4. Gao, G. Liu, Y. S. Wang, M. Gu, M. & Yong, J. H. (2015) A query expansion method for retrieving online BIM resources based on Industry Foundation Classes, Automation in Construction, 56, 14-25. https://doi.org/10.1016/j.autcon.2015.04.006
  5. Kim, C. & Jeong, E. (2004). A model of integrated evaluation to establish the design brief of building performance improvement, Journal of Architectural Institute of Korea, 20(6), 4-11.
  6. Kim, K. (2016). Integrated mansgement of required information for BIM-based FM using a semantic web, Doctoral dissertation, Kwangwoon University, Seoul, Korea.
  7. Lima, C. Diraby, E. T. & Stephens, J. (2005) Ontology-based optimisation of knowledge management in e-construction, ITCon, 10, 305-327.
  8. Pauwels, P. & Deursen, D. V. (2012). IFC/RDF: adaptation, aggregation and enrichment, First international workshop on Linked Data in Architecture and Construction, Belgium.
  9. Pauwels, P. & Roxin, A. (2016) SimpleBIM: from full ifcOWL graphs to simplified building graphs, 11th European Conference on Product and Process Modelling, London, 11-18.
  10. Pauwels, P. & Terkaj, W. (2016). EXPRESS to OWL for construction industry: towards a recommendable and usable ifcOWL ontology, Automation in Construction, 63, 100-133. https://doi.org/10.1016/j.autcon.2015.12.003
  11. Sandkuhl, K. (2009). Information logistics in networked organizations: selected concepts and applications, Enterprise Information System, 12, 43-54.
  12. Seo, M. Jeong, S. Choi, W. & Nah, H. (2012). A Technical Architecture Development of Social Infrastructure Asset Managmement Information Systems in Korea, Engineering Asset Management and Infrastructure Sustainability, 813-827.
  13. Shin, S. (2015). A priority decision-making support model of service resource allocation for educational facilities. Doctoral dissertation, Ewha Womans University, Seoul, Korea.