DOI QR코드

DOI QR Code

The Way of Improving the Working Environment for Female Workers on Construction Site Based on Construction Welfare Facilities

  • Pak, Sungsine (Department of Architecture & Building Engineering, Kunsan National University) ;
  • Shin, Chang-Keun (Hanshin Engineering Construction) ;
  • Lee, Sang-Hak (Department of Architecture & Building Engineering, Kunsan National University)
  • 투고 : 2019.12.31
  • 심사 : 2020.06.09
  • 발행 : 2020.06.30

초록

This paper reports problems of current working environment on construction site in South Korea from a female laborers' point of view and proposes solutions to improve the environment. To investigate and analyze the problems, a questionnaire survey and a focus group interview were conducted with 341 engineers and 557 laborers. Among them female engineers and female laborers were 51 and 136 respectively. Findings are the facilities related with welfare facilities such as lavatories, shower rooms, lounges and changing room, etc. for women were not sufficient and even not installed only for women because all of the planners for the facilities were men and The Standard of Estimate does not consider gender distinction. The data on the trade and the number of female laborers were not recorded and this study confirmed the number and the proportion of female laborers according to construction progress i.e. the proportion of female laborers were 0% ~ 11% (average 6%) at 26 construction sites having 2% ~ 92 % construction progress. In order to solve these problems, gender education for the welfare facility planner is required and the current Standard of Estimate should be revised considering female laborers after collecting the site data for the number of female laborers according progress and the increase in the construction cost should be reflected in the contract amount accordingly. Conclusively temporary work planning related with welfare facilities should be established and conducted in terms of gender equality at construction sites. In addition, improving working environment on construction sites for female laborers will enhance the company's image and also helping solve the labor shortage problem by women laborers engaging in construction industry easily.

키워드

참고문헌

  1. Aulin, R., & Jingmond, M. (2011). Issues confronting women participation in the construction industry, Advances in Engineering & Technology - Contribution of Scientific Research in Development Conference.
  2. Baik, J. C.(2014). A Study on the direct construction system application to solve the skilled worker lack problem, Seoul National University of Science &Technology, Graduate school of Construction Industry.
  3. Choi, H. K.(1999). A Study on Current Supply and Demand Status Problems for Skilled Laborers on Construction Sites. Namseoul University, Graduate school of Architectual Engineering.
  4. Dyble, J. (2018). John Holland looks to tackle gender pay gap. Construction Global.
  5. Jang, M., Cha, E., & Kang, M. (2011). Future Directions of the Gender Impact Assessment of Urban Project Based on Gender Analysis. Journal of the Architectural Institute of Korea Planning & Design, 27(10).
  6. Kim, D. (2014). A Basic Study on Investigation of Current Craftmen Status in Construction Site. Journal of the Architectural Institute of Korea Structure & Construction, 30(11), 81-88 https://doi.org/10.5659/JAIK_SC.2014.30.11.81
  7. Kim, G., Jung, Y., Kim J., & Lee Y. (2012). A Study on Selection and Importance of Laborers' Productivity Factors in Building Construction Site. Journal of the Architectural Institute of Korea Structure & Construction, 28(9), 183-190 https://doi.org/10.5659/JAIK_SC.2012.28.9.183
  8. Konno, Y. (2015). Attempts to Make the Construction Industry More Empowering for Women. Research Institute of Economy, Trade and Industry.
  9. Mackenzie, S. (1980). Women and the reproduction of labor in the industrial city: A case study. Working Paper 23, Department of Urban and Regional Studies, University of Sussex.
  10. Ministry of Employment and Labor. Affirmative Action Report (2015).
  11. Moncaster, M., & Dillon, M. (2018). How gender equality can help fix the construction industry. The Conversation.
  12. Powell, A., Hassanb, T. M., A. Daintyb, R. J., & Carter, C. (2009). Note: Exploring gender differences in construction research: a European perspective. Construction Management and Economics, 27(9).
  13. Richardson, L. (2018). Construction skills shortage: Could tackling gender diversity issues provide the answer?. Construction Global.
  14. Saito, M. (2018). Japan Wants More Women in Construction. The New York Times.
  15. Sang, K., & Powell, A. (2012). Gender Inequality in the Construction Industry. Procs 28th Annual ARCOM Conference.
  16. Schiebinger, L., & Schraudner, M. (2011). Interdisciplinary Approaches to Achieving Gendered Innovations in Science, Medicine, and Engineering. Interdisciplinary Science Reviews, 36(2).
  17. Shin U. C.(2004). Improvement measures for the employment environment for construction laborers. Construction Economy, Korea Research Institute For Human Settlements.
  18. Shin, W., Lee, D., & Son, C. (2013). An Analysis for Work Performance of Female Field Manager of General Construction Company. Journal of the Korea Institute of Building Construction, 13(1).
  19. Shin, W., & Son, C. (2014). An Evaluation of the Public Image on Construction Industry and Its Improvement Measures. Journal of the Architectural Institute of Korea Planning & Design, 30(9).
  20. Shin, W., & Son, C. (2016). An Analysis on the Stress Influence Factors of Worker in the Construction Field and Its Resolution Method. Journal of the Architectural Institute of Korea Structure & Construction, 32(8), 45-52 https://doi.org/10.5659/JAIK_SC.2016.32.8.45
  21. Son, C. (2006). A Comparative Analysis on the Labor Environment and Perceptions of Male and Female Construction Laborers. Journal of the Architectural Institute of Korea Planning & Design, 22(4).
  22. Son, C. (2012). An Analysis on the Installation Condition of Convenience Facilities for Construction Laborers and Its Improvements Measures. Journal of the Architectural Institute of Korea Planning & Design, 28(4).
  23. Son C., Lee D., & Seo B. (2011). A Study on Investigation of Women's Work Performance in Design Stage. Journal of the regional association of architectural institute of Korea, 13(4).
  24. Yoon M.(2014). A study on the working environment improvement of construction workers at apartment building construction site. Seoul National University of Science &Technology, Graduate school of Construction Industry.
  25. Youn, T., & Lee, S. (2012). Policymaking Improvement Strategy for Fine Laboring Ability of Construction Works. Journal of KICEM, 13(2), 37-48.
  26. https://www.aa-net.or.kr/
  27. https://www.aa-net.or.kr/
  28. https://genderedinnovations.stanford.edu/
  29. https://kess.kedi.re.kr/
  30. http://kosis.kr/