DOI QR코드

DOI QR Code

건설 안전관리 모바일 애플리케이션 프로토타입 개발

Proposal of Construction Safety Management Mobile Application Prototype

  • 투고 : 2020.08.21
  • 심사 : 2020.10.16
  • 발행 : 2020.10.30

초록

Differently from the recent decline in the disaster rate of the entire industry, the accident rate of the construction industry is increasing as the scale and complexity of the construction work increases. It can be seen that various efforts are needed to prevent construction disasters. As part of this, it is necessary to use IT technology for construction work, and among them, safety management using smartphones will be useful. According to a survey on the application status and satisfaction of construction safety management applications developed so far, there were many cases of low practical use. This study proposes a process for construction safety management applications that can increase utilization at construction sites. Interviews were conducted with safety managers who directly utilize the application to identify the advantages and disadvantages of the application and additional necessary functions. The survey indicated that the application should reflect the ability to simplify the registration of nonconformities reports, change the reporting system and input method of risk assessment, and check the overall risk level of the site at a glance. Reflecting these functions, a process for safety management applications is proposed that can be more useful and convenient at construction sites.

키워드

과제정보

이 성과는 정부(과학기술정보통신부)의 재원으로 한국연구재단의 지원을 받아 수행된 연구임(No. 2018R1D1A1B0705066013).

참고문헌

  1. Ministry of Employment and Labor (2019). Analysis of Industrial Accident Status 2018
  2. Ministry of Employment and Labor (2018). Analysis of Industrial Accident Status 2017
  3. Ministry of Employment and Labor (2017). Analysis of Industrial Accident Status 2016
  4. Korea Occupational Safety & Health Agency (2018). 2. A Guide of Risk Assessment Model for Explanation.
  5. Korea Occupational Safety & Health Agency (2011). Risk Assessment Model for Construction Work Types 8th
  6. An, S., & Song, S. (2012). Integrated Safety Risk Assessment and Response Preparation on Construction Site Formwork Using FMECA Method, Korea Journal of Business Administration, 14(3), pp.39-48
  7. Lee, H., Kim, H., Park, M., Lee, K., & Lee, S. (2009). Construction Risk Assessment Methodology Using Site Risk Influence Factors, Korean Journal of Construction Engineering and Management, KICEM, 10(6), pp.117-126
  8. Ko, S., Song, H., & Lee, J. (2004). A Study on the Hazard of Work Types for Building Construction, Journal of the Architectural Institute of Korea, Planning and Design Section, 20(5), pp. 136-143
  9. Yu, Y., Choi, J., Kim, T., & Lee, C. (2019). A risk Assessment Method using Disaster Influence Factors on Construction Project, Journal of Architectural Institute of Korea, Planning and Design Section, 35(6), pp. 3-12
  10. Choi, J., Kim, T., & Lee, C. (2019). Effects of Weather Factors on the Work Loss Days of the Elderly Workers, Korean Journal of Construction Engineering and Management, KICEM, 20(1), pp. 41-51 https://doi.org/10.6106/KJCEM.2019.20.1.041
  11. Sin, W., & Son, S. (2018). An Analysis on the Accident Influence Factor and Severity of Construction General Workers, Journal of Architectural Institute of Korea, Structure and Construction Section, 34(3), pp. 69-76
  12. Sin, W., & Son, S. (2018). An Analysis on the Safety Accident Network and Risk Level of Construction Machine and Equipment, Journal of Architectural Institute of Korea, Structure and Construction Section, 34(5), pp. 35-42
  13. Kim, E. (2018). Analysis on the Factors of Construction Disaster Applying the AHP, Journal of Architectural Institute of Korea, 20(1)
  14. Cho, J. (2017). A Study on the Application Plan of the Optimized Risk Assessment Model in Construction Field, Journal of Korea Safety Management & Science, 19(4)
  15. Peak, C., & Cho, U. (2015). A Study on the Perception Level of Health and Safety among the Participants for Optimization of Risk Assessment in Construction Industry, Journal of Korea Safety Management & Science, 17(3)
  16. Yu, Y., Sin, D., & Kim, S. (2009). A Risk Assessment Method for the Small and Medium Construction Companies, Journal of Academic Conference of the Construction Management Association of Korea, pp. 428-432.
  17. Park, S., Choi, J., & Lee, C. (2020). Risk Assessment Method for Activities of Apartment Construction, Journal of Architectural Institute of Korea, Planning and Design Section, 36(3), pp.135-145
  18. Jin, J. (2019). A Study on utilization of Construction Safety Management Mobile App. Master's Thesis, Graduate School, Eulji University
  19. Kim, D., & Kim, H. (2001). A Plan of an Accident Classification System for the Analysis of Disaster information in Construction Projects, Journal of the Architectural Institute of Korea Structure and Construction Section, 17(11), pp. 139-145.
  20. Nam, M. (2008). A study on a model for evaluating the risk of major disasters in construction. Domestic master's thesis, Graduate School of Engineering, Korea University,
  21. Ko, K., Oh, S., & Lee, C. (2016). Application prototype development for periodic inspection of buildings. Journal of the Architectural Institute of Korea Structure and Construction Section, 32(1), pp. 63-71. https://doi.org/10.5659/JAIK_SC.2016.32.1.63