DOI QR코드

DOI QR Code

공동주택 리모델링 초기 설계안 검토 자동화 시스템 - 벽체, 바닥판의 정량 데이터 추출

Automated and Quantitative Data Extraction of Walls and Slabs from Before- and After-Remodeling Floor Plans

  • 투고 : 2020.11.25
  • 심사 : 2021.03.16
  • 발행 : 2021.03.30

초록

It is estimated in 2020 that over 2.4 million houses in Korea are aged more than 30 years. This means that over 40% of the entire houses in Korea are considerably aged. Two options could be taken to improve the poor residential environment: either reconstruction or remodeling. Compared to reconstruction, remodeling has advantages on the construction period and cost. In addition, remodeling is environmentally friendly; and therefore, current regulation is favorable to remodeling over reconstruction. During the early stages of the apartment remodeling project, many candidate floor plans are presented. In order for the evaluation of those multiple candidate plans, extracting information regarding bearing walls and other structural elements from the plans is critical. Accordingly, an automated and quantitative data extraction system for walls and slabs from before- and after-remodeling floor plans is developed. With the developed program, it is possible to analyze and visualize bearing walls, non-bearing walls, slabs, and weight alterations after remodeling in a rapid and automated manner.

키워드

참고문헌

  1. Autodesk. (2020). Revit Help. About Modifying Elements. Retrieved from https://help.autodesk.com/
  2. Choi, H., Jang, K., & Lee, Y. (2020). Study on 3D Stratum model generation and Tunnel quantity using BIM, Journal of Korean Society of Road Engineers, 22(3), 59-65.
  3. Choi, H., Joo, H. J., Kim, H. J., & Yoon, S. J. (2012). Structural Behavior of Slab in the Partial Demolition for the Apartment Remodeling, Journal of The Korea Institute for Structural Maintenance and Inspection, 16(2), 19-30. https://doi.org/10.11112/jksmi.2012.16.2.019
  4. Choi, H., Joo, H. J., Lee, S., & Yoon, S. J. (2010). An Analytical Study on the Behavior of Slab Structure Considering the Remodeling. Journal of The Korea Institute for Structural Maintenance and Inspection, 14(2), 106-112. https://doi.org/10.11112/jksmi.2010.14.2.106
  5. Choi, J. P. Kim, H. J. & Lee, Y. J. (2011). Design Guidelines for the Extension of Aged Apartment Remodeling, Journal of the Architectural Institute of Korea, 27(1), 19-28.
  6. Graphisoft. (2020). Help Center. Solid Operations. Retrieved from https://helpcenter.graphisoft.com/user-guide-chapter
  7. Hong, G.-H., & Jung, W. K. (2007). An Analysis on the Seismic Performance of Additional Shear-Wall Construction for the Remodeling of Shear-Wall Apartment Buildings, Journal of The Korea Institute for Structural Maintenance and Inspection, 11(1), 153-162.
  8. Hong, J. H., Yeom, D. J., Choi, S. J., & Kim, Y. S. (2017). A Study of the Decision Support Model to Select an Appropriate Alternative Plan in Apartment Remodeling. Journal of the Architectural Institute of Korea Structure & Construction, 33(3), 41-50. https://doi.org/10.5659/JAIK_SC.2017.33.3.41
  9. Hur, M.-W., Y. H., L., & Lee, S. H. (2019). The Optimal Isolation Period of Vertically Story-added Remodeling Apartment Building with Seismic Isolation System, Journal of The Korea Institute for Structural Maintenance and Inspection, 23(3), 65-74.
  10. Hyoun, C. K. (2013). Structural Analysis and Design for Remodeling of Apartment Building, Review of Architecture and Building Science, 57(10), 27-33.
  11. Joo, S. U., Kim, C. K., Kim, S. U., & Noh, J. O. (2017). BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures, Journal of the Computational Structural Engineering Institute of Korea, 30(6), 567-576. https://doi.org/10.7734/COSEIK.2017.30.6.567
  12. Jung, G. Y., Woo, J. W., Kang, K. D., & Shin, J. C. (2013). Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume, KIBIM Magazine, 3(3), 9-18. https://doi.org/10.13161/kibim.2013.3.3.009
  13. Kim, G. J., Hong, E. H., Lee, J. S., Chun, J. Y., & Kim, B. S. (2015). A Performance Assessment Process and Systemization for Apartment Housing Remodeling, Journal of the Architectural Institute of Korea Structure & Construction, 31(10), 47-55. https://doi.org/10.5659/JAIK_SC.2015.31.10.47
  14. Kim, H.-J., Choi, J.-S., Kim, H.-S., & Kim, I.-H. (2013). The Development of Data Model for Open BIM-Based Schematic Estimates, Journal of the Architectural Institute of Korea 29(3), 61-70.
  15. Kim, H. S., & Lee, D. G. (2001). Efficient Seismic Analysis of High-Rise Shear Wall Building Structures considering the Flexural Stiffness of Floor Slabs, Journal of the Computational Structural Engineering Institute of Korea, 14(2), 193-202.
  16. Kim, K., Yoon, Y., & Kim, C. (2016). Improvements in the Business Process Model for the Aged Apartment Remodeling Project, Korean Journal of Construction Engineering and Management, 17(5), 45-53. https://doi.org/10.6106/KJCEM.2016.17.5.045
  17. Kim, S.-A., Park, G., Song, B.-S., Choi, C.-H., & Chin, S.-Y. (2016). A Study on Setting Up Work Conditions for Improving Productiviyt of BIM-based Cost Estimation. Korean Journal of Construction Engineering and Management, 17(1), 56-65. https://doi.org/10.6106/KJCEM.2016.17.1.056
  18. Kim, S.-A., Ryu, H. M. & Kim, J. Y. (2021). Automated and qualitative structural evaluation of floor plans for remodeling of apartment housing, Journal of Computational Design and Engineering, 8(1), 376-391. https://doi.org/10.1093/jcde/qwaa085
  19. Kim, S.-C. (2013). The Building Structural Problems and Solutions for the Remodeling of Vertical Extension. Review of Architecture and Building Science, 57(10), 23-26.
  20. Kim, Y.-J., Kim, S.-A., & Chin, S.-Y. (2012). A Study of BIM based estimation Modeling data reliability improvement. Korean Journal of Construction Engineering and Management, 13(3), 43-55. https://doi.org/10.6106/KJCEM.2012.13.3.043
  21. Koo, S. B., Kim, C. H., Sim, J.-S., Lee, D.-B., & Kim, J. Y. (2018). "Automatic Quantitative Evaluation System for Apartment Complex Remodeling." The 12th International Symposium on Architectural Interchanges in Asia (ISAIA), Pyeongchang, Korea.
  22. Lee, D. G., Lee, H. C., & Park, J. Y. (2019). A Study on the Estimation Accuracy through BIM-Based Detailed Cost Estimation, Journal of the Korean housing association, 30(5), 1-8. https://doi.org/10.6107/jkha.2019.30.5.001
  23. Lee, D.-G., & Cha, H. (2016). A Probabilistic Risk-based Cost Estimation Model for Initial-Stage Decision Making on Apartment Remolding Projects, Korean Journal of Construction Engineering and Management, 17(2), 70-79. https://doi.org/10.6106/KJCEM.2016.17.2.070
  24. Lee, J.-C., Jung, J.-H., & Lim, N.-G. (2005). Analysis of Stress Variation According to Removal of Shear Wall At the Remodeling of Shear Wall Type Apartment, Korean Journal of Construction Engineering and Management, 6(3), 72-80.
  25. Lee, J.-H., Lee, S.-W., & Kim, T.-Y. (2019). A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering, Journal of the Korea society of computer and information, 24(2), 127-137. https://doi.org/10.9708/JKSCI.2019.24.02.127
  26. Lee, J. S., Song, J. K. & H. G. H. (2005). A Study on the Remodeling Design Guidelines through Reviewing of Structural Performances in Apartment, Journal of the Architectural Institute of Korea, 21(11), 21-28.
  27. Lee, S.-W., Kim, J.-S., & Jeon, B.-K. (2015). Structural Alternatives for Remodeling of the Vertical Extension of Three Floors. Journal of the Architectural Institute of Korea Structure & Construction, 31(12), 11-22. https://doi.org/10.5659/JAIK_SC.2015.31.12.11
  28. Oh, S. H. (2014). Effective Seismic Structural System for Vertical Extension Remodeling of Apartment. Magazine of the Korea Institute for Structural Maintenance and Inspection, 18(1), 3-8. Retrieved from http://www.riss.kr/link?id=A100389339
  29. Park, Y.-J., Won, S.-K., Han, C.-H., & Lee, J. B. (2011). A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Projects, Journal of the Architectural Institute of Korea, 27(6), 123-130.
  30. Shin, H. C., Choi, K. B., & Yoon, S. C. (2018). A Study on the Optimization of Field Sampling Number of the Durability Evaluation Method for the Extension Remodeling of the Apartment Housing, Journal of The Korea Institute for Structural Maintenance and Inspection, 22(3), 60-68. https://doi.org/10.11112/JKSMI.2018.22.3.060
  31. Shin, J. C., Hwang, J. H., Lee, S. G., & Lee, S. W. (2012). BIM based Reliability Analysis and Automated Quantity Calculation. Journal of Korean Society of Disaster & Security, 12(3), 49-56.
  32. Yoon, J.-D., Cho, H.-S., Lee, J.-H., Shin, J.-Y., & Kim, E.-S. (2020). A Comparison of Quantity Take-Offs of RC Structures based on BIM. Journal of the Computational Structural Engineering Institute of Korea, 33(1), 35-44. https://doi.org/10.7734/COSEIK.2020.33.1.35