A Case Study on Causes of the Conflicts Hindering Collaboration between Consortium Participants from Small and Medium-sized Construction Company's Perspective

중소 건설사 관점의 공동도급 협업 저해 요인 사례연구

  • Received : 2021.08.18
  • Accepted : 2022.01.27
  • Published : 2022.02.28

Abstract

In the public sector, the joint contract system offers benefits and provides additional opportunities in enabling consortium parties to share risks, improve its technical skills and reward a project more compared to when participating alone. It's a compulsory rule to include local companies to help facilitate and maintain balance in the development of local regions. Contrary to the purpose behind introducing a joint contract system, detailed institutional laws and operational guidelines have been insufficient, consequently causing difficulties in the management of joint contracts. Specifically, the asymmetric size of parties, specialized human resources and experience influence collaborative efforts during the project phase. Despite asymmetry, the joint contract system was studied from the perspective of major construction companies while focusing on the bidding process. This research aims to explore its conflicts and reasons from relatively small companies based on four stages: bidding, contract, construction and hand-over/termination in H construction company. 30 real cases introducing joint contracts were analyzed along with focus group interviews. The results revealed that risks existed during the preparatory stage of the joint supply and demand operation agreement even after much deliberation due to the differences in company size, some paper companies did not participate in the actual construction process and management regulatory issues surfaced during the organizational phase of the joint supply and demand operation agreement. Therefore, to resolve these conflicts, constant mutual trust is needed between companies and further analysis is necessary from joint contract construction case studies.

Keywords

References

  1. Akhund, M,A., Khoso, A. R., Pathan, A.A., Imad, H. U., &Siddiqui, F. (2018). Risk attributes, influencing the time and coust overrun in joint venture construction projects of Pakistan. Enginnering, Technology & Applied Science Research, 8(4), 3260-3264. https://doi.org/10.48084/etasr.2203
  2. Choi, H.M. (2018). A Study on the Joint Venture Contract by the Joint Implementation Method of Step by Step Contract Dispute Cause and Resolution, Master Thesis, Korea University.
  3. Hong, S.C., & Park, C.S. (1997). An Effective Operation and Management Scheme for Construction Joint-Venture Contract. Journal of Architectural Institute of Korea, 13(6), 383-392.
  4. Hwang, S.H. (2014). A Study on the Unconstitutionality of the regional quota of the Construction Joint Contract System, Ph.D. Dissertation, Kwangwoon University.
  5. Jeong, S.J. (2015). Improvements of Joint-Venture contract System with a Prime Contractor, Master Thesis, University of Seoul.
  6. Jung, K.S. (2010). A Legal Study on The Joint Venture, Master Thesis, Kwangwoon University.
  7. Kim, C.S. (2015). A Legal Study on the Construction Claims, Ph.D. Dissertation, Hoseo University.
  8. Kim, H.S. (2021). A Study on joint venture. Ph.D. Dissertation, Hanyang University.
  9. Kim, J.T. (2013). A Study on the Joint Venture Contract for the Public Construction, Master Thesis, Hanyang University.
  10. Kim, K.H. (2013). A Study on Joint-Venture Contracts of Construction Industry in Korea, Master Thesis, Hanyang University.
  11. Kim, M.S. (2003). Operation status and problems of the joint contract system. Journal of Construction Economy, 28-41
  12. Ku, J.C. (2016). A Study on solution of the disputes between the construction joint ventures and the interested parties, Master Thesis, Kwangwoon University.
  13. Lee, J.W., Kim, W.S., Choi, M.I., Kim, Y.H., & Hyun, C.T. (2001). A Study on the Improvement of Joint-Venture Methods for the Design-Build in the Domestic Building Construction, Journal of Architectural Institute of Korea, 21(2), 639-642.
  14. Lee, S.M. (2001). Efficiency of Joint Contract Operations, Construction & Economy Research Institute of Korea 1-145.
  15. Lee, K.O. (2019). A study on the improvement plan of taxation system of joint contract -Focused on joint construction contract-, Ph.D. Dissertation, Sungkyunkwan University.
  16. Lee, M.J., Kim, J.T., Ji, S.G., Park, W.Y., & Seo, J.W. (2013). Study on the Joint Venture Contract of Problems and Resolution -Focusing on the Joint Implementation Method-, Journal of Korean Society of Civil Engineers, 65-68
  17. Lim, E.S., Choi, E.K., & Cho, Y.H. (2003). The Study on the analyzing the problems occurred at construction site due to compulsory local joint contract, Journal of Architectural Institute of Korea, 23(1), 431-434.
  18. Park, S.H., Lee, J.K., Yang, C.H., Lee, J., & Kang, Y.K. (2021). Derivation of Design Elements for Connection through Urban Underground using FGI Method, Journal of Korean Society of Road Engineers, 23(2), 129-136.
  19. Park, S.K. (2010). A Study on Efficiency of the Joint Contract among Local Constructors for the public Procurement Works, Master Thesis, Kyung Hee University.
  20. Seo, M.S., & Kim, M.H. (2002). A Study on the Effective Operation Model of Joint-Venture Contract - With a Focus on the Example of Domestic Construction Industry, Journal of Korea Institute of Construction Engineering and Management, 3(1), 103-111.
  21. Seo, S.S. (2013). A Study on the Legal Relationships of Construction Joint Ventures, Master Thesis, Sungkyunkwan University.
  22. Shim, K.H. (2008). A Study of Taxation of Joint Construction, Master Thesis, Chung-Ang University.
  23. Yang, S.Y. (2012). A Study on Revitalization Plan for Joint Venture Contract System with Prime Contractor of Construction, Master Thesis, Korea Aerospace University.
  24. Yin, R.K. (2011). Case Study Research : Design and Methods 5th Edition. Hankyungsa.