DOI QR코드

DOI QR Code

건설회사 현장기술인력의 역량 수준 분석 및 향상방안

An Analysis on Performance Level of Field Managers in Construction Company and Its Improvement Measures

  • 신원상 (한국건설인정책연구원) ;
  • 손창백 (세명대학교 건축공학과)
  • 투고 : 2023.05.25
  • 심사 : 2023.06.22
  • 발행 : 2023.07.28

초록

This study purpose of analyze the individual and job competency levels of elementary and intermediate field managers in construction sites. It also proposes measures to enhance their capabilities by examining the current technical manpower education and training system. The results indicated individual competencies exhibited deficiencies in crucial areas such as planning, coordination, integration, visual presentation, and leadership. Likewise, job competencies lacked proficiency in quality management, environmental management, and safety management. The education and training provided for personal competencies were limited in scope, primarily focusing on moral aspects. Consequently, the development of essential personal competencies was not effectively addressed. Job competency education and training predominantly emphasized theoretical knowledge transfer, impeding the enhancement of practical skills. Moreover, the current programs failed to keep pace with technological advancements and societal trends, neglecting the incorporation of consumer demands. To bolster the job capabilities of domestic elementary and intermediate field managers, it is crucial to expand educational programs to emphasize practical skills. Additionally, educational content should be updated promptly to align with evolving times and technological developments. There is quite a need for diversification and subdivision of educational content across different educational institutions.

키워드

과제정보

본 성과는 정부(과학기술정보통신부)의 재원으로 한국연구재단의 지원을 받아 수행된 연구임(NRF-2021R1A2C2006065).

참고문헌

  1. Choi, J. H., & Kim, Y. S. (2013). An Analysis of Core Competency of Construction Field Engineer for Cost Management, Korean Journal of Construction Engineering and Management, 14(5), 26-34 https://doi.org/10.6106/KJCEM.2013.14.5.026
  2. Hong, S. H., Jung, D. W., & Oh, C. D. (2015). Analysis of Competence Factors Assessment for Specialty Contractors' Employees using IPA, Korean Journal of Construction Engineering and Management, 16(5), 21-30 https://doi.org/10.6106/KJCEM.2015.16.5.021
  3. Jung, S. Y., & Yu, J. H. (2017). Analysis of Factors Affecting Job Competency of Quality Management for a Construction Manager, Korean Journal of Construction Engineering and Management, 18(1), 65-73
  4. Kang, S. M., Cha, M. S., Lee, W. J., Ji, W. J., & Yoo, W. S. (2020). Improved Model for Index of Construction Engineer's Competency Evaluation System in Domestic Construction Management, Korean Journal of Construction Engineering and Management, 21(2), 47-58
  5. Kim, D. S., Joh, H. W., Kim, G. H., Joo, J. K., & Shin, Y. S. (2020). A Study on the Evaluation Criteria of Safety Competency of Construction Manager, Korean Journal of Construction Engineering and Management, 21(5), 46-54
  6. Kim, D. Y., Kim, H. R., & Jang, H. S. (2018). An Analysis of the Casual Relations on Construction Project Manager's level Competency, Journal of the Architectural Institute of Korea, 34(3), 77-86
  7. Kim, H. Y., & Kim, Y. S. (2018). Analyzing the Competence of Construction Engineers in Apartment Construction, Korean Journal of Construction Engineering and Management, 19(6), 14-23
  8. Kim, S. B., Byun, J. Y., Kim, J. H., & Kim, J. J. (2014). Analysis of Competence Factors Assessment for Specialty Contractors' Employees using IPA, Korean Journal of Construction Engineering and Management, 15(3), 103-112
  9. Shin, W. S., Lee, J. Y., & Son, C. B. (2023). An Analysis on Performance Level Status of Construction Managers in Construction Field and Its Improvement Measures, Journal of the Architectural Institute of Korea, 39(2), 287-294 https://doi.org/10.5659/JAIK.2023.39.2.287
  10. Yang, J. K., Kim, S. B., & Lee, S. B. (2017). An Extraction and ANP Importance Analysis for Competence Factors of Junior Grade CM Engineer, Korean Journal of Construction Engineering and Management, 18(1), 58-64 https://doi.org/10.6106/KJCEM.2017.18.2.058