• Title/Summary/Keyword: Demolition Waste Generation

Search Result 9, Processing Time 0.024 seconds

The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris (건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안)

  • Lee, Hi Sun;Kim, Dong Sik
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.1
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

Estimation of the Waste Generation in Building Demolition Work using Drone (드론-BIM 기반 건축물 해체공사의 폐기물 발생량 평가)

  • Ryu, Jung Rim;Park, Won-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.309-310
    • /
    • 2021
  • In order to respond to environmental problems and to efficiently recycle resources, it is important to evaluate the amount of construction waste generated. In particular, the estimation of the amount of waste generated in the demolition work was performed based on the basic unit of waste generated per floor area. This study proposes a method using drones as a method for evaluating the amount of demolition waste in a wide area. In the simulated application, the field measurement results and the proposed method were compared, and the effectiveness of the building volume calculation using drones was confirmed. It was confirmed that the building volume can be calculated quickly in the additional pilot application.

  • PDF

A Study on Estimating Recycling Potential of Demolition Waste Generated in End-of-Life of Buildings by Structural Type Considering Economic Efficiency (경제적 효율성 측면에서 건축물 구조를 고려한 해체폐기물의 재활용가능성에 관한 연구)

  • Cha, Gi-Wook;Kim, Jin Ho;Moon, Hyeun Jun;Kim, Young-Chan;Hong, Won-Hwa
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.4
    • /
    • pp.153-161
    • /
    • 2020
  • This study investigates the recycling potential of demolition waste (DW) according to building structure, while considering economic aspects. For that, this study surveyed 1,034 residential buildings to collect reliable information on demolition waste generation rates (DWGRs). This study suggested a method for operational cost calculation for each stage and carried out an inventory analysis. The economic value of recycled DW materials was also calculated. And then, the recycling potential(RP) was calculated by building structures and waste types. RP by building structure was low (27-40%), and RP was found in the order of masonry-block, wooden, RC and concrete-brick. By type of DWs, the RP of aggregates was considerably lower than 7%, and DWs such as wood, plastics, and metals showed more than 100% RP. Considering the results of this study, In order to improve the RP of buildings and DWs, the diversification of products that recycled waste like aggregates (i.e., mortar, concrete, bricks, blocks, tiles) and the development of high value-added products are considered to be the most urgent problems. Based on the above RP results, this study proposed a more advanced method for life cycle assessment of buildings and demolition waste.

Building waste management plan using BIM and RFID technology (BIM과 RFID 기술을 활용한 건설 폐기물 관리 방안)

  • Duan, Chen;An, Ie-sle;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.12 no.2
    • /
    • pp.26-39
    • /
    • 2022
  • The purpose of this study is to establish a novel system for on-site management of construction and demolition waste. Construction waste has always been one of largest waste in the world and has long lacked an effective management system. Although various countries have planned the disposal of waste at the political level, the real-time and effective management of construction sites has not been mentioned. Especially in China, the continuous development of the construction industry also generates a large amount of waste, and China is not prepared for a large amount of construction waste. In order to alleviate the huge impact of construction waste on society and the environment, this study proposes a waste management method that combines Building Information Modeling technology and Radio Frequency Identification technology. Through this research, by using information technology to manage the generation and discharge of construction waste, and record the amount and information of waste generation, also improve the management method of construction waste.

Development of a waste recognition model at construction sites (건설현장에서 발생하는 폐기물 인식 모델 개발)

  • Na, Seunguk;Heo, Seokjae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.219-220
    • /
    • 2021
  • It is considered that the construction industry is one of the pivotal players in the national economy in terms of Gross Domestic Production (GDP) and employment. Behind the positive role of this industrial sector to the national economy, the construction industry generates approximately 50 % of the total waste generation from all the industrial sectors. There are several measures to mitigate the adverse impacts of the construction waste such as reduce, reuse and recycle. Recycling would be one of the effective strategies for waste minimisation, which would be able to reduce the demand upon new resources as well as enhance reusing the construction materials on sites. The automated construction waste classification system would make it possible not only to reduce the amount of labour input but also mitigate the possibility of errors during the manual classification process. In this study, we proposed an automated waste segmentation and classification system for recycling the construction and demolition waste in the real construction site context. Since the practical application to the real-world construction sites was one of the significant factors to develop the system, a YOLACT (You Only Look At CoefficienTs) algorithm was chosen to conduct the study. In this study, it is expected that the proposed system would make it possible to enhance the productivity as well as the cost efficiency by reducing the manpower for the construction and demolition waste management at the construction site.

  • PDF

Estimation Method of the Amount of Demolition Waste through Automated Calculation of Volumetric Spaces using Drones (드론 활용 체적산출 자동화를 통한 해체 폐기물량 예측기법에 관한 연구)

  • Ryu, Jung-Rim;Kim, Hye-Ri;Park, Won-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.681-688
    • /
    • 2022
  • In this study, the process of drone photography, automatic volume calculation, total floor area conversion, and waste calculation was constructed as a QGIS plug-in to predict the demolition waste (DW) generated in an aged area where drawing information or building information is uncertain. Through a case study, the high consistency between the automatically calculated volume using the drone and the BIM volume based on the field measurement was confirmed. Field application was carried out for the planned demolition work site, and the consistency between the drone-based volume and the actual measurement-BIM-based volume was reconfirmed. The waste generation unit was applied and the amount of DW was calculated by setting the floor height and building type, and the entire process was completed within 6 hours. Although the difference between building information and building objects through drones occurred according to the setting of temporary structures, loads, and floor heights, it was found that the actual amount of DW was generated more than the initial estimate. It is expected that measures to improve the accuracy of volume and floor area conversion will be required through case studies in the future.

Calculation and Analysis of Actual Recycling Rate and Final Disposal Rate of Industrial Waste by Material Flow Analysis (물질흐름분석을 통한 사업장폐기물의 실제적인 재활용률과 최종처분율의 산정 및 분석)

  • Oh, Gil-Jong;Cho, Yoon-A;Kim, Ji-Yeon;Kim, Ki-Heon
    • Journal of Korea Society of Waste Management
    • /
    • v.35 no.8
    • /
    • pp.785-798
    • /
    • 2018
  • Since the Framework Act on Resource Circulation was enacted in 2018, the government should establish a National Resource Circulation Master Plan every 10 years, which defines mid- to long-term policy goals and directions on the efficient use of resources, prevention of waste generation and recycling of waste. In addition, we must set mid- to long-term and stepwise targets for the final disposal rate, recycling rate (based on sorted recyclable materials and recycled products), and energy recovery rate of wastes, and relevant measures should be taken to achieve these targets. However, the current industrial waste (IW) statistics have limitations in setting these targets because the final disposal rate and recycling rate are calculated as the ratio of the recycling facility input to the IW generation. In this study, the material flow from the collection stage to the final disposal of industrial waste was analyzed based on the generation of 2016, and the actual recycling amount, actual incineration amount, final disposal amount and their rates were calculated. The effect on the recycling, incineration and final disposal rates was examined by changing the treatment method of nonhazardous wastes from the factory and construction and demolition wastes, which were put in landfills in 2016. In addition, the variation of the waste treatment charge was investigated according to the change of treatment methods. The results of this study are expected to be effectively used to establish the National Resource Circulation Master Plan and industrial waste management policy in the future in South Korea.

An Evaluation of Plastic and Early Dry Shrinkage of Fiber Reinforced Concrete Using Recycled Aggregate (순환잔골재를 활용한 섬유 보강 콘크리트의 소성 및 초기 건조수축평가)

  • Park, Yun-Mi;Kim, Young-Duck;Kim, Young-Sun;Kim, Ho-Dong;Kim, Gyu-Yong;Kim, Moo-Han
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.937-940
    • /
    • 2008
  • Recently, the recycling and reusing of construction and demolition waste concrete is urgently required because generation quantity of construction and demolition waste concrete is greatly increased according to the rapid increasing of urban redevelopment project. On the other hand, the problem solution for demand and supply unbalance of fine aggregate is urgently required because of the restriction of collecting sea fine aggregate by intensification of environment influence evaluation and the shortage of river fine aggregate. but a quality of aggregate as building structure is not demonstrated. Therefore it is the objective of this study to estimate plastic and early dry shrink crack of fiber reinforced concrete using a recycled aggregate by plat-ring test and mock-up test of exposure to the air. as a result, in case of plat- ring test, developing crack is wider using recycled aggregate concrete than natural aggregate concrete, is wider using fiber reinforced concrete than non fiber. in case of mock-up test of exposure to the air, it is similar to plat-ring test.

  • PDF

Comparison of the Construction Waste Generated by the Project and the Estimation of the Waste Generation Unit (건설공사 공정별 건설폐기물 발생량 비교 및 폐기물 발생 원단위 산정에 관한 연구)

  • Song, Tae-Hyeob;Seong, Jin-Uk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.4
    • /
    • pp.427-434
    • /
    • 2017
  • The generation of construction waste can be divided into a decommissioning phase and a new construction phase, and most of the waste is generated at the decommissioning stage. However, recently, domestic new construction construction has expanded to 150 trillion yards per year, so construction work is increasing rapidly. Especially, as the size of the construction work with much waste of construction waste exceeds 100 trillion, the management of the amount of construction waste in the new construction site is required. Unlike the dismantling work site, the new construction site can separate waste generated by each property, and relatively low foreign matter content is generated. The purpose of this study was to investigate the amount of construction waste generated by new construction sites and to calculate the unit amount of construction waste based on this. In addition, since the existing unit cost is centered on concrete and mixed waste, we set the basic unit by setting synthetic resin, waste wood, and waste board as additional items. The basic unit survey was carried out to investigate the wastes according to the characteristics of each construction period. As a result of the survey, the new construction site showed that most wastes were discharged in the first 30% and after 70% of the process, and the ratio of mixed construction waste was as high as 45%. As a result of this study, it was found that about twice as much waste was produced as compared with the conventional standard product.