• Title/Summary/Keyword: Document of Construction Plan

Search Result 31, Processing Time 0.028 seconds

A study on Safety Keywords that Construction Project Managers Should Know (건설사업관리기술자가 알아야 할 안전키워드에 관한 연구)

  • Kim, Sang-Won;Choi, Yu-Jin;Hong, Seong-Wook;Ahn, Tae-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.95-96
    • /
    • 2017
  • A total of eleven keywords for construction project management engineers to know about safety are as follows. Before the construction, there are two keywords as the safety organization plan and safety management plan, safety compliance, document beach, safety check, safety management fee, hazardous risk prevention plan, safety education, safety accident, seven keywords, There are two keywords of safety inspection comprehensive report, safety management document. It is necessary to understand the keywords well in accordance with the relevant time and to do the best in safety work, and it should be recognized that safety inspection is carried out every month and the safety work should be done faithfully.

  • PDF

A STUDY ON THE PROCESS OF LARGE-SCALE REPAIR OF A CONDOMINIUM

  • Seki, Eiji;Akiyama, Tetukazu
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2002.11a
    • /
    • pp.295-300
    • /
    • 2002
  • Since the contents of large-scale repair of a condominium were various, a plan document was not prepared. The owners association of the condominium has given priority to decision-making of price priority over quality. Examination is not performed about the contents of the construction supervision business, which checks whether suitable construction is performed, either. On the other hand, the know-how for builders, such as decision of the process plan under which the repair work lessens influence to the safety and life as much as possible since the place where the resident is living turns into a construction site, and selection of a method of construction, is just going to ask. It is an important subject how the structure of the construction contractor selection, which considered quality, is built. Then, this research focuses on large-scale repair construction of the condominium, and arranges the actual condition of a series of processes from plan document creation to construction supervision. The method of research collects the construction documents of the condominium that carried out Barge-scale repair construction. Next, collection arrangement of the data of construction builder selection is carried out. The method of the construction builder selection of those other than a construction price is examined. The method of quality control of large-scale repair construction is examined.

  • PDF

The Study on the Application of Electronic Document Standards tn construction CALS/EC (건설CALS/EC에서의 전자문서 표준 적용방안 연구)

  • Jung, Sung-Yoon;Choi, Won-Sik;Ok, Hyun;Kim, Sung-Jin
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.90-96
    • /
    • 2003
  • The purpose of this study is to develop the standards for construction documents. The standards will facilitate efficient exchange and sharing of construction documents among the participants such as owners, designers, constructors and other related parts throughout construction work process. For this reason, this study is intended to define the requirements for establishing XML-based electronic document standardization system, and to prepare the plan for developing XML electronic document in a consistent way.

  • PDF

A study on the Project Management Plan (PMP) Development Appropriate for Global Construction Environment (글로벌 건설 환경에 적합한 건설사업관리계획서(PMP)에 관한 연구)

  • Yang, Myung-duck;Kim, Chang-kwon;Yang, Jae-woong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.107-108
    • /
    • 2015
  • It's became essential that Korea construction companies should enter into the overseas construction market for their growth and sustainability. In order to comply with the client's required global standard and to compete with in the international market, the shifting the construction project management system to global level is required. In accordance with the demand, this paper proposes the top-level document of construction project management system as a to-be model that utilized in overseas construction projects. The project management plan ("PMP") suggested in this paper is not only the most appropriate one, which complies with the global standard, to be used when companies bid for international construction projects against foreign competitors but also has the process modeling and hierarchical structure.

  • PDF

Improvement of Synthesis Construction Plan through 6sigma (6시그마를 통한 종합시공계획서 작성 프로세스 개선)

  • Baek, Ho-Jin;Yoo, Chang-Kyu;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.613-617
    • /
    • 2007
  • To achieve project successfully in domestic construction site, pre-management of risk is important factor. Synthesis Construction Document made early construction is representative as means of pre-management of risk. But, Synthesis Construction Document is not working properly for pre-management of risk because the level is low as Synthesis Construction Document is made formally and the time is too late to pre manage the risk for various factor. A epoch-making method that differ with existing need to solve this deep-rooted problem of domestic construction site. So, this study is analyzing to achieve subject to heighten level Synthesis Construction Document and shorten creation period with "S"construction company(introducing 6sigma by tool of management innovation 6 sigma)'s data and offering an opportunity that heightens effectiveness and goes forward and aims possibility about construction site suitability of 6sigma by confirming Pilot Test.

  • PDF

A Study on Risk Assessment of GHG Inventory Verification (온실가스 인벤토리 검증의 위험성평가에 대한 연구)

  • Lee, Kang-Bok;Kim, Geon-Ho;Lee, Seung-Hwan;Lee, Eun-Sook
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.203-208
    • /
    • 2009
  • Government and company are unfolding greenhouse gas reduction activity to prevent the effects of global warming. Also, verification business through greenhouse gas inventory construction is spreaded variously. Greenhouse gas verification proceeds by document examination, risk analysis, field survey. Document investigates emission information, calculation standard, emission report, data management system. And through risk assessment result, establish field verification plan. Through study on risk assessment of greenhouse gas inventory verification, wish to reduce risk of verification.

  • PDF

A Study on Intellgence Emergency Guide Line System (지능형 피난유도선 시스템에 대한 연구)

  • Park, Yong-Gyu;Kim, Suk-Eun;Kang, Kyung-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.04a
    • /
    • pp.107-116
    • /
    • 2010
  • Government and company are unfolding greenhouse gas reduction activity to prevent the effects of global warming. Also, verification business through greenhouse gas inventory construction is spreaded variously. Greenhouse gas verification proceeds by document examination, risk analysis, field survey. Document investigates emission information, calculation standard, emission report, data management system. And through risk assessment result, establish field verification plan. Through study on risk assessment of greenhouse gas inventory verification, wish to reduce risk of verification.

  • PDF

Procedure and Document Format for Requesting Construction of Local Administrative Offices by each Province in the 1930s (1930년대 각도의 지방행정관청사 건축요구 절차 및 문서형식)

  • Kim, Myungsun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.6
    • /
    • pp.43-49
    • /
    • 2021
  • During the Japanese colonial period in Korea, the Choson Governor-General was a kind of state organ. At that time, for a local administrative office to be built, each province('Do') had to go through a certain administrative procedure and be approved by the Choson Government-General. In addition, it was necessary to receive financial support from the Choson Governor-General in the name of "state assistance" because the financial conditions of each province were not sufficient. To obtain this approval and financial support, the administrative procedure was divided into the first half, where each province requested the construction of a local administrative office, and the second half, where the Choson government-general approved it and supported it financially. There are studies on the first half procedure in 1914 and 1927, which were limited to the new construction of county('Goon') offices among several local administrative offices. This study analyzed the first half of the construction of all local administrative offices in the 1930s.

A Study on the Standardization of the Built-in Wardrobe by Housing Inside Dimension (공동주택 안목치수 설계기준에 의한 붙박이장의 표준화방안 연구)

  • Lee, Ga-Kyung;Lim, Seok-Ho
    • Journal of the Korean housing association
    • /
    • v.21 no.6
    • /
    • pp.53-60
    • /
    • 2010
  • Built-in wardrobe is constructing after ordering and making, because built-in wardrobe's size is fixed as housing measurement. It is hard to speak built-in wardrobe components of construction in these ways, and application of an MC (Modular Coordination) design system is meaningless too. And above all, measurement before construction isn't to expect standardization, and to increase custom-made furniture. So I suggest the standardization of built-in wardrobe utilizing standard last finish and reference plane in order to prevent an evil influence of built-in wardrobe's construction. And we utilized a reference plane, and we present construction document and design plan in order to solve these problems. The first stage, we investigate manufacture of a preferential domestic system kitchen and construction state, and we derive from a problem in viewpoints of standardization for this. And we analyze an effect got by application of the assembly basis aspect that we presented, and we can raise efficiency of standardization of housing and construction industry, and we light ultimately up. I will apply a standardization plan as above, and define that this assures a standardization of components and an economic effect.

Study on Solutions to the Heavy Work of Safety Managers at Construction Sites (건설현장 안전관리자의 과중한 서류업무 해소방안 연구)

  • Cho Choonhwan
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.5 no.1
    • /
    • pp.1-8
    • /
    • 2023
  • The purpose of this study is to suggest a way to solve the excessive paperwork of safety managers in domestic construction sites, and to suggest a work efficiency plan that can shorten the time required to prevent safety accidents. First, a function to automatically generate a safety document and find the necessary data is applied using the RPA program. The second is document creation using mobile devices. After safety training, use the Moleil app to keep the training log. Third, to prevent omission of essential safety and health documents, the automatic warning function is activated according to the RPA submission time and sent to the person in charge by e-mail or text. Fourth, the function to find the latest data with high accuracy and speed through 'Google Cloud Search', a search function, was applied.