• 제목/요약/키워드: Space Construction Model

검색결과 644건 처리시간 0.023초

Construction of 3D Earth Optical Model for Earth Remote Sensing (Amon-Ra) Instrument at L1 Halo Orbit

  • Ryu, Dong-Ok;Seong, Se-Hyun;Hong, Jin-Suk;Kim, Sug-Whan
    • 한국우주과학회:학술대회논문집(한국우주과학회보)
    • /
    • 한국우주과학회 2011년도 한국우주과학회보 제20권1호
    • /
    • pp.30.1-30.1
    • /
    • 2011
  • We present construction of 3D Earth optical Model for in-orbit performance prediction of L1 halo orbiting earth remote sensing instrument; the Albedo Monitor and Radiometer (Amon-Ra) using Integrated Ray Tracing (IRT) computational technique. The 3 components are defined in IRT; 1) Sun model, 2) Earth system model (Atmosphere, Land and Ocean), 3)Amon-Ra Instrument model. In this report, constructed sun model has Lambertian scattering hemisphere structure. The atmosphere is composed of 16 distributed structures and each optical model includes scatter model with both reflecting and transmitting direction respond to 5 deg. intervals of azimuth and zenith angles. Land structure model uses coastline and 5 kinds of vegetation distribution data structure, and its non-Lambertian scattering is defined with the semi-empirical "parametric kernel method" used for MODIS (NASA) missions. The ocean model includes sea ice cap with the sea ice area data from NOAA, and sea water optical model which is considering non-Lambertian sun-glint scattering. The IRT computation demonstrate that the designed Amon-Ra optical system satisfies the imaging and radiometric performance requirement. The technical details of the 3D Earth Model, IRT model construction and its computation results are presented together with future-works.

  • PDF

초고층 마감공사 준비작업 개선을 위한 현장사진기반 공간모델 개발 (Development of Space-Model Based on Site Images for Improving Preparation Process of Interior Construction in High-rise Buildings)

  • 황준영;김승현;정현조;김해곤;박성호;구교진;홍태훈;현창택
    • 한국건설관리학회논문집
    • /
    • 제9권2호
    • /
    • pp.90-98
    • /
    • 2008
  • 초고층건축물의 수요가 증가하고 수요지역이 확장함에 따라 초고층건설 기술력향상의 필요성이 증가하고 있다. 또한, 건물의 초고층화로 인해 마감공사는 프로젝트전체에 영향을 미치는 중요한 관리요소가 되고 있다. 이에 본 연구는 마감공사 준비작업의 의사결정 및 수행을 지원하기 위한 도구로서 현장사진기반 공간모델을 제안하고 있으며, 그 구축방법을 제시하고 활용방안을 모색하고자 하였다. 현장사진기반 공간모델을 통하여 초고층프로젝트의 특성과 공종에 맞는 공간모델을 활용이 가능할 것으로 예상되며, 이를 통하여 건설분야에서의 공간모델 실용화를 기대할 수 있을 것이다.

A STUDY ON SPACE ZONING BY COMPUTING IDLE-TIMES IN CONSTRUCTION PROCESSES

  • Sang-Min Park;Won-Suk Jang;Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.509-512
    • /
    • 2013
  • An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).

  • PDF

건설 분야 전자도면의 모델 기반 교환을 위한 IFC2.x2모델의 2차원 형상정보모델의 확장 개발에 관한 기초 연구 (Development of Two Dimensional Extension Model far IFC2.x2 Model in the Construction Field)

  • 김인한;서종철
    • 한국CDE학회논문집
    • /
    • 제10권2호
    • /
    • pp.121-132
    • /
    • 2005
  • There have been several efforts for the investigation of the formal development team which was formed in the IAI to develop a common 2D standard specification between ISO/STEP and IAI/IFC since 2002. As a result, a drafting model has been included in the IFC2.x2 model. However, to be used actively in the construction practice for construction drawing exchange, the IFC model should be extended to the paper space for multiple views, drawing output, and delivery of drawings. Therefore, in this paper, the methodology of relating STEP and IFC has been investigated and schema extension of paper space(drawing sheet, presentation view, view pipeline), complex entity(leader), and dimension(associative) have been achieved. The resulting, IFC model will enable a basic harmonization with KOSDIC. SCADEC, and STEP-CDS by retaining the current IFC architecture. In addition, IT systems for the construction industry can be beneficial from the developed data model.

SOC Verification Based on WGL

  • Du, Zhen-Jun;Li, Min
    • 한국멀티미디어학회논문지
    • /
    • 제9권12호
    • /
    • pp.1607-1616
    • /
    • 2006
  • The growing market of multimedia and digital signal processing requires significant data-path portions of SoCs. However, the common models for verification are not suitable for SoCs. A novel model--WGL (Weighted Generalized List) is proposed, which is based on the general-list decomposition of polynomials, with three different weights and manipulation rules introduced to effect node sharing and the canonicity. Timing parameters and operations on them are also considered. Examples show the word-level WGL is the only model to linearly represent the common word-level functions and the bit-level WGL is especially suitable for arithmetic intensive circuits. The model is proved to be a uniform and efficient model for both bit-level and word-level functions. Then Based on the WGL model, a backward-construction logic-verification approach is presented, which reduces time and space complexity for multipliers to polynomial complexity(time complexity is less than $O(n^{3.6})$ and space complexity is less than $O(n^{1.5})$) without hierarchical partitioning. Finally, a construction methodology of word-level polynomials is also presented in order to implement complex high-level verification, which combines order computation and coefficient solving, and adopts an efficient backward approach. The construction complexity is much less than the existing ones, e.g. the construction time for multipliers grows at the power of less than 1.6 in the size of the input word without increasing the maximal space required. The WGL model and the verification methods based on WGL show their theoretical and applicable significance in SoC design.

  • PDF

RISK ANALYSIS FOR INDUSTRIAL PROJECT IN CONSTRUCTION PHASE: A MONTE-CARLO SIMULATION APPROACH

  • Soo-Yong Kim;Luu Truong Van;Han-Ki Ha;Nguyen Quoc Tuan
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.130-139
    • /
    • 2007
  • This paper presents a study on risk analysis in terms of contractor's costs in construction phase in which Crystal ball (software of Decisioneering, UK) has been utilized as a main tool. To realize it, a questionnaire survey has been carried out to identify the dominant factors that strongly influence contractor costs in Vietnam. Based on results of questionnaire investigation, the survey identified three factors which were duration of each construction task, costs of reinforcing steel, and cement. Then a spreadsheet model was created in order to analyze risks. The study also indicates that the cost of reinforcing steel and cement are the cause of risks for contractors. According to the suggested model, contractors may foresee the probability of completion within the approved budget, and the possibility of earning in accordance with owner's payment conditions.

  • PDF

QUANTITATIVE ANALYSES USING 4D MODELS - AN EXPLORATIVE STUDY

  • Rogier Jongeling;Jonghoon Kim;Claudio Mourgues;Martin Fischer;Thomas Olofsson
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.830-835
    • /
    • 2005
  • 4D models help construction planners to develop and evaluate construction plans. However, current analyses using 4D models are mainly visual and limit the quantitative comparison of construction alternatives. This paper explores the usefulness of extracting quantitative information from 4D models to support time-space analyses. We use two 4D models of an industry test case to illustrate how to analyze 4D content quantitatively (i.e., work space areas and distances between concurrent activities). This paper shows how these two types of 4D content can be extracted from 4D models to support 4D-based-analysis and novel presentation of construction planning information. We suggest further research to formalize the content of 4D models to enable comparative quantitative analyses of construction planning alternatives. Formalized 4D content will enable the development of reasoning mechanisms that automate 4D-model-based analyses and provide the information content for informative presentations of construction planning information.

  • PDF

A Study on Ganui-Dae's External Form and Its Modeling for Restoration

  • Lee, Min-Soo;Lee, Yong Sam;Jeon, Jun Hyeok;Kim, Sang Hyuk
    • Journal of Astronomy and Space Sciences
    • /
    • 제30권4호
    • /
    • pp.299-305
    • /
    • 2013
  • Ganui-Dae, built in the reign of King Sejong, Joseon Dynasty, is a comprehensive observatory. It has various instruments for observation and time signal such as Ganui, Gyupyo(Gnomon), water-hammering type Honui and Honsang, and so on. Studying on Ganui-Dae has been focused on its location, history, criterion, etc, so far. However, studying on its external form and construction method has been conducted insufficiently. This study suggests the model for restoration of Ganui-Dae. The model is based on the analysis about external form of Ganui-Dae in various antique maps, and its construction method in those days.

고려인 라키비움 공간구축 모형에 관한 연구 (A Study on the Koryoin Larchiveum Space Construction Model)

  • 박현지;장우권
    • 한국비블리아학회지
    • /
    • 제34권3호
    • /
    • pp.183-204
    • /
    • 2023
  • 이 연구의 목적은 고려인 역사문화관을 중심으로 라키비움의 공간·기능을 고려한 고려인 라키비움 구축모형을 제시하는 데 있다. 이를 위해 사서, 기록연구사, 학예사 등을 대상으로 설문조사를 실시하였으며 기관별 공간 및 업무 요구도 간 평균 차이를 알아보고자 다변량 분산분석(MANOVA)을 실시하였다. 또한 설문조사를 바탕으로 2차 전문가(관장, 대표자, 고려인 전문가 등) 대상의 공간구성 요소에 대한 심층면담을 실시하였다. 그 결과 첫째, 고려인 라키비움에 필요한 기능 위주로 설정한 공간·기능적 요소를 도출하였다. 공간요소는 도서관은 보존서고, 열람실, 휴게공간, 기록관은 기록물 보존실과 전시실, 문화관은 수장고와 전시실 등이다. 기능(업무)은 도서관 3, 기록관 5, 문화관 4개의 요소로 나타났다. 둘째, 면담 내용의 검토를 거쳐 고려인 라키비움 구축모형을 수정·보완하여 구성하였다. 공간구성은 지하1층에서 지상 3층까지 설치공간, 업무내용, 담당인력 등을 제시하였다.

Towards More Accurate Space-Use Prediction: A Conceptual Framework of an Agent-Based Space-Use Prediction Simulation System

  • Cha, Seung Hyun;Kim, Tae Wan
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.349-352
    • /
    • 2015
  • Size of building has a direct relationship with building cost, energy use and space maintenance cost. Therefore, minimizing building size during a project development is of paramount importance against such wastes. However, incautious reduction of building size may result in crowded space, and therefore harms the functionality despite the fact that building is supposed to satisfactorily support users' activity. A well-balanced design solution is, therefore, needed at an optimum level that minimizes building size in tandem with providing sufficient space to maintain functionality. For such design, architects and engineers need to be informed accurate and reliable space-use information. We present in this paper a conceptual framework of an agent-based space-use prediction simulation system that provides individual level space-use information over time in a building in consideration of project specific user information and activity schedules, space preference, ad beavioural rules. The information will accordingly assist architects and engineers to optimize space of the building as appropriate.

  • PDF