• Title/Summary/Keyword: Temporary Equipment and Materials

Search Result 20, Processing Time 0.023 seconds

Feasibility Analysis for the Introduction of Safety Certification System for Assembled Temporary Equipment and Materials (조립된 가설기자재 안전인증제도 도입의 타당성 분석)

  • Jeong, Seong Choon;Kwon, Jun Hyuk;Won, Jeong Hun;Kwon, Yong Jun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.32-42
    • /
    • 2020
  • In this study, in order to secure the necessity of introducing the safety certification system for the assembled temporary equipment and materials, the feasibility of the introduction was analyzed through literature review, structural analysis, and actual experiments and surveys related to the assembled temporary equipment and materials. In the previous studies, it was found that the research on the assembled temporary equipment and materials was insufficient, and it was possible to grasp the necessity of introducing the safety certification system for the assembled temporary equipment and materials. In addition, in the results of the serious accident analysis, it was found that the soundness of the temporary equipment and materials is determined by the structural characteristics after it was assembled. As a result of the feasibility analysis of the introduction of the safety certification of the assembled temporary equipment and materials through structural analysis, it is possible to effectively and rationally reflect the main geometrical influence factors, and to introduce the safety certification system that can test the procedures and procedures of the assembled temporary equipment and materials and based on it. It was found that there is a need. As a result of feasibility analysis on the necessity of introducing the safety certification system for assembled temporary equipment and materials through actual experiments, the existing single member performance evaluation has limitations in evaluating the structural performance of the assembled temporary equipment and materials. It was found that there is a need to introduce a safety certification system. As a result of gathering opinions on the feasibility of introducing the safety certification system for assembled temporary equipment and materials of manufacturers and users through the survey, it was found that the overall positive response result was high and the effectiveness was high.

Damage Detection and Damage Quantification of Temporary works Equipment based on Explainable Artificial Intelligence (XAI)

  • Cheolhee Lee;Taehoe Koo;Namwook Park;Nakhoon Lim
    • Journal of Internet Computing and Services
    • /
    • v.25 no.2
    • /
    • pp.11-19
    • /
    • 2024
  • This paper was studied abouta technology for detecting damage to temporary works equipment used in construction sites with explainable artificial intelligence (XAI). Temporary works equipment is mostly composed of steel or aluminum, and it is reused several times due to the characters of the materials in temporary works equipment. However, it sometimes causes accidents at construction sites by using low or decreased quality of temporary works equipment because the regulation and restriction of reuse in them is not strict. Currently, safety rules such as related government laws, standards, and regulations for quality control of temporary works equipment have not been established. Additionally, the inspection results were often different according to the inspector's level of training. To overcome these limitations, a method based with AI and image processing technology was developed. In addition, it was devised by applying explainableartificial intelligence (XAI) technology so that the inspector makes more exact decision with resultsin damage detect with image analysis by the XAI which is a developed AI model for analysis of temporary works equipment. In the experiments, temporary works equipment was photographed with a 4k-quality camera, and the learned artificial intelligence model was trained with 610 labelingdata, and the accuracy was tested by analyzing the image recording data of temporary works equipment. As a result, the accuracy of damage detect by the XAI was 95.0% for the training dataset, 92.0% for the validation dataset, and 90.0% for the test dataset. This was shown aboutthe reliability of the performance of the developed artificial intelligence. It was verified for usability of explainable artificial intelligence to detect damage in temporary works equipment by the experiments. However, to improve the level of commercial software, the XAI need to be trained more by real data set and the ability to detect damage has to be kept or increased when the real data set is applied.

Survey and Improvement Scheme for Safety Certification System of Temporary Equipment and Materials (가설기자재 관련 안전인증제도 실태조사 및 개선방안)

  • Won, Bang-Hee;Yoon, Kyeong-Won;Jeon, Sang-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.7
    • /
    • pp.92-102
    • /
    • 2016
  • In this study, the systems and standards for temporary equipment and materials established in domestic and foreign countries are examined to provide improvement schemes and to insure their safety. Statistical analyses of the data obtained from the internet and/or field visit surveys of employees working in manufacturing, leasing, and construction companies related to temporary equipment and materials and improvement schemes were conducted to evaluate the implementation of a safety certification system for currently used temporary equipment and materials. This safety certification system has been enforced since 2009, but the number of accidents at construction sites, which are reported by the 'serious accident cases and measures in construction sites' group of the Korea Occupational Safety & Health Agency (KOSHA), has increased. The respondents' answers regarding the suitability of the items, which are required for the safety certification of the equipment and materials, were 'yes (36%)', 'no (30%)', and 'unknown (35%)'. Less than half of the answers regarding the current system were positive and most of the respondents answered that the current system does not reflect the evolution of the construction environment. A system is needed to approve items certified in foreign countries and newly developed materials and items, in addition to the (automatic) registration for the reuse of temporary equipment and materials, and improvements are needed in their safety. In this study, after examining the size and practicability of the items requiring approval from the current system, the certification methods are reevaluated and improvement schemes are provided for the system.

Comparative Study on the Color Stability of Temporary Prosthetic Materials for Dental CAD-CAM (치과 CAD-CAM용 임시 수복재의 색 안정성 비교 연구)

  • Lee, Hye-Eun;Kim, Won-Soo;Kim, Jung-suk;Lee, Ju-hee;Won, Seuck-Jae
    • Journal of Technologic Dentistry
    • /
    • v.38 no.3
    • /
    • pp.165-173
    • /
    • 2016
  • Purpose: This study was conducted to examine the color stability of temporary prosthetic materials for dental CAD-CAM. Method: 2 kinds of existing acrylic resin temporary filling materials and 2 kinds of polymer prosthetic materials for dental CAD-CAM were used for testing, and five specimens respectively were absorbed in soy sauce, red pepper paste, and coffee. A Chroma Meter was used as analysis equipment. The color change of the specimens was observed to calculate ${\Delta}E$ value throughout 2 days, 3 days, 4 days, and 5 days and this was analyzed and the following result was obtained. Results: Snap's ${\Delta}E$ value was bigger than Vipi block(p<0.05). Red pepper paste had the largest impact on the color change of resin(${\Delta}E$), followed by soy sauce and coffee(p<0.000). With the passage of time, ${\Delta}E$ value was inversely(-) related and decreased somewhat(p<0.000).

A Comparative Study on Domestic and Foreign the Follow-up Service of Temporary Equipment and Materials (국내외 가설기자재 사후관리제도 비교 연구)

  • Woo Kwang-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.74-82
    • /
    • 2002
  • The performance testing system of temporary construction equipment and materials are a previous inspect institution to produce only goods beyond the limited-performance, be certificated through a previous test, the purpose of which is to prevent an illegal goods from spreading abroad. The formal certification not only pass the test in an ordinary means but also isn't the term of validity on a certificated goods. Because of the above two reasons, an accident doesn't reduce, and a illegal goods become to be circulated. So, in this study, we analysis the problem of the follow-up service based on the formal certification and we suggest the improvement through comparative study on the follow-up of domestic and foreign.

A Feasibility Study of Safety Cetification for Finished Product of Febricated Temporary (조립식 가설기자재의 완성품에 대한 안전인증 타당성 연구)

  • Lee, Jeong-Seok;Choe, Jin-U
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2013.11a
    • /
    • pp.39-48
    • /
    • 2013
  • Recently, the using of prefabricated temporary equipments is increasing in the industrial field because it can reduce the installation and dismantling period. The various types of prefabricated temporary equipments are manufacturing with various materials in domestic and overseas countries. However, those equipments should win the safety certificate according to the "Governmental Notification about Safety Certification" which regulate the member-based safety certification. It tends to cause over performance of temporary equipments because it couldn't consider structural benefit of the prefabricated products. As the result of this study, it is concluded that the establishment of new safety certification standard for the prefabricated temporary equipments is resonable and the movable scaffold is appropriate for those prefabricated temporary equipment. The movable scaffolds are using as single structure and cannot be expands horizontally. Other types of temporary equipments are using as complex structure which can freely expand horizontally according to the main structure. From the results of the study, the standard of vertical compression performance of prefabricated movable scaffolds should be more than double the performance of single main frame. Other test items of safety certification standard should be fixed when the Notification is amended. The prefabricated temporary equipments which are adopted for the safety standard on assembled structure should be used, moved and kept in assembled state and not separated discretionally. The establishment of new standard for the assembled structure based on this study leads to the development of various types of temporary equipments using structural efficiency of prefabricated structure.

  • PDF

A Study on the Analysis of Current Situation and the Deduction of Improvement Measure Regarding the Scaffolding and the Related Components at Construction Site (건설 현장 가설기자재 운영현황 분석 및 개선 방안 도출 연구)

  • Jeong, Jin Woo;Kim, Yong Gon
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.5
    • /
    • pp.63-71
    • /
    • 2019
  • Work Guideline of Construction Quality Management was revised in July 2017, and it has changed the perception of scaffolding in South Korea. The on site investigation and survey was performed on manufacturers, leasing companies, and quality inspection agencies regarding the compliance with the guideline for the scaffolding and the related components brought to the site. Moreover, the related guidelines and identified unsatisfactory quality management items were analyzed by each subject. As a result, the major factors that cause the problems were reasonably deducted. The related regulations to prohibit the delivery of faulty scaffolding components to the construction site in order to secure the safety of the temporary structure was suggested.

Impact on Retrievability by Cement Variety for Implant Restorations Equipped with a Lingual Slot

  • Lee, Ji-Hong;Lee, Kyu-Bok
    • Journal of Korean Dental Science
    • /
    • v.11 no.1
    • /
    • pp.14-20
    • /
    • 2018
  • Purpose: The purpose of this study is to measure and compare the removal torques of different cements applied in attachments of zirconia restorations on titanium (Ti) abutments fitted with retrievable cement-type slot (RCS) on the lingual side for the better retrievablity by use of a slot driver. Materials and Methods: Three types of cements were used in the experiment: two permanent cements in $RelyX^{TM}$ U200 (RU) (3M ESPE) which is a resin cement and $FujiCem^{TM}$ (FC) (GC) which is a resin-modified glass ionomer cement, and a temporary cement in $Freegenol^{TM}$ temporary cement (TC) (GC). Measurements of removal torques were conducted as follows; an attached sample was fixed on the equipment customized for the experiment; a slot driver was connected to a MGT12 (Mark-10 Corp.), a torque measurement instrument; the sample had the driver fitted to its RCS and then was rotated until the it was removed; and finally, the maximum torque value was recorded. Result: As for the removal torque measurement results, the average values were $47.9{\pm}2.6Ncm$ for RU, $43.4{\pm}1.5Ncm$ for FC, and $20.9{\pm}1.0Ncm$ for TC. The statistical analysis using Kruskal-Wallis test yielded the significance probability of P<0.05 (P=0.002), which confirmed the presence of significant differences between the three groups. Conclusion: All three cements exhibit clinically acceptable levels of removal torque when applied to an upper zirconia implant restoration fitted with a lingual slot, with RU and FC, the two permanent cements, having the significantly higher values than that of TC, the temporary cement.

Double quench and fault current limiting characteristics due to winding ratio of transformer type SFCL with third winding

  • Han, Tae-Hee;Ko, Seok-Cheol;Lim, Sung-Hun
    • Progress in Superconductivity and Cryogenics
    • /
    • v.21 no.3
    • /
    • pp.38-42
    • /
    • 2019
  • To protect the power systems from fault current, the rated protective equipment should be installed. However growth of power system scale and concentration of loads caused the large fault current in power transmission system and distribution system. And capacities of installed protective equipment have been exceeded the due to increase of fault current. This increase is not temporary phenomenon but will be steadily as long as the industry develops. The power system need a counter measurement for safety, so superconducting fault current limiter (SFCL) has been received attention as an effective solutions to reduce the fault current. For the above reasons various type SFCL is studied recently. In this paper, the operational characteristics and power burden of trigger type SFCL is studied. The trigger type SFCL has been used for real system research in many countries. And another trigger type SFCL (double quench trigger type SFCL) is also studied. For this paper, short circuit test is performed.

Analysis on operation characteristics and power burdens of the double quench trigger type SFCLs

  • Lim, Seung-Taek;Lim, Sung-Hun;Han, Tae-Hee
    • Progress in Superconductivity and Cryogenics
    • /
    • v.19 no.2
    • /
    • pp.33-37
    • /
    • 2017
  • To protect the power systems from fault current, the rated protective equipment should be installed. However growth of power system scale and concentration of loads caused the large fault current in power transmission system and distribution system. The capacities of installed protective equipment have been exceeded the due to increase of fault current. This increase is not temporary phenomenon but will be steadily as long as the industry develops. The power system operator need a counter-measurement for safety, so superconducting fault current limiter (SFCL) has been received attention as effective solutions to reduce the fault current. For the above reasons various type SFCLs have been studied recently. In this paper, operation characteristics and power burden of trigger type SFCL is studied. The trigger type SFCL has been used for real system research in many countries. Another trigger type SFCL (double quench trigger type SFCL) is also studied. For this paper, short circuit test is performed.