• 제목/요약/키워드: operation time

검색결과 11,208건 처리시간 0.039초

원격지 수도시설 펌프운영 패턴의 자동화 알고리즘 구현 (A1gorithm Embodiment for Automatic Pump Operation Pattern)

  • 변두균;윤영환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 D
    • /
    • pp.2474-2476
    • /
    • 2003
  • An algorithm was embodied to automatic pump operation Pattern for remote control located in 60 km far. This automation pattern included least cost operation, peak load time response, pump operation time balancing etc. It was programmed four kind of operation mode as following; normal operation nude, before peak load time nude, peak load time operation, after peak load time operation.

  • PDF

가변 지속시간을 갖는 이벤트 기반 원격제어 (Event Based Tele-Operation with Variable Holding Time)

  • 박준영;박장현
    • 한국정밀공학회지
    • /
    • 제19권12호
    • /
    • pp.70-77
    • /
    • 2002
  • Necessity of the tole-operation has been increased in many fields. Since the Internet is inexpensive and available all over the world, it is a strong candidate for the transmission media of the tole-operation. However, the Internet has random time delays that may cause instability in the system especially if the tole -operation is bilateral. In the past few years many attempts have been made to overcome the random time delay, So far, they are still insufficient in terms of performance. The ‘Variable holding time’ is introduced to improve the performance of the ‘Event based tole-operation’ which controls a system with a non-time action reference. By holding each event for proper time, the system can quickly respond and be stabilized. The proper holding time should be selected based on the characteristics of the task that the system performs. The factors that reflect those characteristics are investigated. The fuzzy logic is employed to obtain the proper holding time for each event while the tole-operation system is in operation. The experimental results presented in this paper verify effectiveness of the proposed method.

개선된 알고리즘에 의한 지하철 운행간격 제어 (Train Regulation by the Advanced Algorithm for Subway)

  • 박홍규;심원섭;홍순흠
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.330-333
    • /
    • 2002
  • Even if the train of subway starts in a certain interval from the origin according to the operation plan. as the number of passenger gets increased during operation. the boarding and getting-off time will increase, and the temporary breakdown happens to the system of train during operation, causing the delay from the operation plan. this leads to the vicious circle of train operation. making the interval of train operation irregular in downtown especially. To solve this problem, we propose the method of advanced algorithm by the actual data relating to the train operation including operation time required between stations, distance between stations. capability of train, and the dwelling time, location and distance between the preceding train and next one. The central train control system adjusts the dwelling time at each station in order to recover the delayed time, and increase the operation speed at the each station. As control algorithm is applied the dwelling time and to increase the speed, the train maintains certain interval after certain amount of time passes.

  • PDF

공급사슬에서 실제 시설물 운영시간을 고려한 시설배치계획에 관한 연구 (Facility Location Planning with Realistic Operation Times in Supply Chain)

  • 이상헌;김숙한
    • 한국경영과학회지
    • /
    • 제30권2호
    • /
    • pp.143-156
    • /
    • 2005
  • Facility location planning (FLP) problem is the strategic level planning in supply chain. The FLP is significantly affected by the operation time of each facility. In most of the FLP researches, operation time of facility has been treated as a fixed value. However, the operation time is not a static factor in real situations and the fixed operation time may lead unrealistic FLP. In this paper, a mixed integer programming (MIP) model is proposed for solving the 3-stage FLP problem and operation times are adjusted by the results from the simulation model and an iterative approach combining the analytic model and simulation model is proposed to obtain more realistic operation plans for FLP problems.

Local-Generator-Based Virtual Power Plant Operation Algorithm Considering Operation Time

  • Park, Sung-Won;Park, Yong-Gi;Son, Sung-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권6호
    • /
    • pp.2127-2137
    • /
    • 2017
  • A virtual power plant (VPP) is a system that virtually integrates power resources based on the VPP participating customer (VPC) unit and operates as a power plant. When VPP operators manage resources to maximize their benefits, load reduction instructions may focus on more responsive VPCs, or those producing high profitability, by using VPC resources with high operation efficiency. VPCs may thus encounter imbalance problems during operation. This imbalance in operation time would bring more participation for some VPCs, causing potential degradation of their resources. Such an operation strategy would be not preferable for VPP operators in managing the relationship with VPCs. This issue impedes both continual VPC participation and economical and reliable VPP operation in the long term. An operation algorithm is therefore proposed that considers the operation time of VPC generators for mandatory reduction of power resource consumption. The algorithm is based on constraints of daily and annual operation times when VPP operators of local generators perform capacity-market power transactions. The algorithm maximizes the operator benefit through VPP operations. The algorithm implements a penalty parameter for imbalances in operation times spent by VPC generators in fulfilling their obligations. An evaluation was conducted on VPP operational effects by applying the algorithm to the Korean power market.

초고층 건축공사의 작업원 양중시간 단축을 위한 리프트 카 운행제어 모델 (Operation Control Model of Lift Car to Reduce Worker Lifting Time in Tall Building Construction)

  • 남철우;권재범;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.160-161
    • /
    • 2016
  • In tall building construction, lift car for worker lifting is a critical factor for construction productivity. To reduce worker lifting time, existing researches have been conducted on lift car planning. While, research on lift car operation is insufficient. For the efficient reduction of worker lifting time, lift car operation control is needed with lift car planning. Therefore, this research suggests operation control model of lift car to reduce worker lifting time. According to the result of a model test, the operation control model contributes to reasonable reduction of worker lifting time.

  • PDF

실시간 전력계통 운영을 위한 데이터 시각화에 관한 연구 (A Study on the Data Visualization for Real Time Power System Operation)

  • 조윤성;정진영
    • 전기학회논문지
    • /
    • 제62권10호
    • /
    • pp.1361-1367
    • /
    • 2013
  • This paper describes and suggests the data visualization for real time power system operation based on energy management system. Because real time power system operation performs analysis of the vast amount of on-line data, the operators need intuitive data visualization to find out useful information in the big data. Especially, in emergency situation, the data visualization is able to assist the operators in handling the crisis quickly and efficiently. Therefore, this paper aims to improve displays of output of real time power system operation by visualizing on-line big data. Through this study, we can develop improved visualization technique for real time power system operation, which has highly readable displays of output and intuitive information.

특징형상을 사용한 사출금형 표준 가공공수계산 (Standard Operation Time Estimation Using Features in Mold Die Manufacturing)

  • 이충수;노형민
    • 대한기계학회논문집
    • /
    • 제18권1호
    • /
    • pp.223-231
    • /
    • 1994
  • When manufacturing mold dies, an operation sheet is required for each part of the mold dies. The consistent estimation of standard operation time in the operation sheet is difficult, because the estimation is mainly based on subjective judgement. In order to resolve it, concept of feature is introduced in this study. For CAD/CAPP integration, feature technology is being implemented to represent geometrical and technological information of part drawings. A feature database has already been designed, and then used to generate data for process and operation planning modules. Related to this former research, standard operation time is calculated using the feature information and tables used in a real factory.

터널발파시 실제 작업시간과 품셈의 비교 분석 (A Comparison of Operation Time between the Standard of Estimate and Actual Operations in Tunnel Blasting)

  • 김양균;김형목
    • 화약ㆍ발파
    • /
    • 제33권3호
    • /
    • pp.14-20
    • /
    • 2015
  • 발파터널의 건설과정에 있어서 가장 중요한 역할을 차지하는 발파작업은 암질상태, 터널의 규모, 사용 장비의 성능, 작업자들의 숙련도 등 다양한 요인에 의해 작업시간에서 차이를 나타낸다. 본 논문에서는 국내 세 곳의 터널발파 현장에서의 발파작업시간 조사를 통해, 표준품셈에서 계산되는 터널발파 사이클 시간과 실제 시공시간과의 차이를 분석하였다. 그 결과, 정상적인 작업이 이루어진 경우 전체적으로 실제 발파작업시간은 품셈보다 약 8%~ 16% 적게 나타나고 있다. 그러나 예상치 못한 상황으로 인해 지연되는 시간까지 포함한다면 실제 작업시간이 품셈을 초과하는 경우가 상당할 것으로 추정되었다. 본 연구는 향후에도 지속적인 작업시간 조사와 품셈과의 비교 분석을 통해 품셈의 적절성을 판단함과 아울러, 발파 굴착의 생산성을 향상시키는데 도움을 주고자 한다.

염류집적 농경지의 전기동력학적 정화 (Electrokinetic Restoration of Saline Agricultural Land)

  • 조성웅;김도형;양중석;정근욱;백기태
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제17권4호
    • /
    • pp.19-26
    • /
    • 2012
  • The influence of operation time on electrokinetic restoration was investigated to remove salts from sulfate-accumulated greenhouse soil. Operation time is directly related to the process cost, therefore, we determined the relationship between operation time and removal of salts. Nitrate and sodium were removed almost completely within 2 weeks, chloride and calcium was removed in proportion to the operation time. Sulfate was accumulated at the center of anode and cathode. The soil electrical conductivity (EC), an indicator for soil salinity, showed similar shape with the residual sulfate after electrokinetic treatment. The soil EC was not changed after 2 weeks, however, the energy consumption increased with operation time. Based on the experimental results, most salts except sulfate were removed within 2 weeks, but sulfate was not removed during same time period. For the further removal of sulfate, longer operation time is in need.